Clearview Gym Build

 

Beautiful Floor finish
Beautiful Floor finish
Last of the Subfloor
Last of the subfloor
paint is done, subfloor is almost down
paint is done, subfloor is almost down
Sound board is up
Sound board is up
Almost at closeup
Almost at lockup
Supporting the 24 tonne panels
Supporting the 24 tonne panels
Lining up the 24 tonne panels
Lining up the 24 tonne panels
Wall were built offfsite and transported in "precast"
Walls were built offfsite and transported in “precast”
100 Tonne Cran
100 Tonne Cran
Placing the first panel
Placing the first panel
Cement floor
Cement floor
Pouring the floor
Pouring the floor
Floor Support
Floor Support
Form is in and getting ready for Floor brackets
Form is in and getting ready for Floor brackets
Crawl space
Crawl space